Steps in PERT or CPM Model

Advertisement
PERT/CPM model building consists of following five steps:
1. Analyse and break down the project in terms of specific activities and/ or events.
2. Determine the interdependence and sequence of specific activities and prepare a net- work.
3. Assign estimates of time, cost or both to all the activities of the network.
4. Identify the longest or critical path through the network.
5. Monitor, evaluate and control the progress of the project by re-planning, rescheduling and reassignment of resources.