Internal Project Review by KPMG Consultants

Internal Project Review by KPMG Consultants
Based on the feedback from all of you on your estimate of UAT (User Acceptance Testing) completion schedule, I have prepared the draft plan and circulating it for your review. I will request each of you to review the dates for your respective modules and let me know if there are any challenges that you foresee.



I will have the following special requests :


1.  OPM Financial Consultants:

a. Please review the AP module UAT scenarios and give the dates.

b. OPM Financial Consultants to discuss freeze the dates. I have already requested both of you to freeze the dates yesterday.

2. OPM Production and Cost Consultants

c. Please review the Costing module UAT scenarios and give me your analysis of the challenges that you foresee

3. Oracle GL and Accounts Payable Consultants

d. Please review the PF, WPPF, LOANS and give your feedback on the dates when you can complete the UAT

e. We also need to finalize the dates when the reports dependent on the above modules can be completed

4. Oracle HR Consultants:

f. Please give me your feedback on the Plant HR scenarios

g. Please give me your feedback on Leave, Absence Management

5. Oracle Supply Chain Consultants

h. Please give me the feedback on Data Master / Open Transactions interface & upload into Validation and Production instances

i. Load testing

j. Cut-over & Backlog timelines


Also please note that client has special request for the following :



At the beginning of any UAT scenario, all the system specific setups, configurations, reports, customization & alerts should be complete. This will speed up the completion of UAT scenarios.

Five stages that many teams and groups go through in their developmental sequence

Five stages that many teams and groups go through in their developmental sequence
The five stage developmental sequence that many groups and teams go through is forming, storming, norming, performing, and adjourning. During the forming stage, members focus their efforts on defining goals and developing procedures for performing their tasks. Members need to get acquainted and come to understand leadership and other member roles. 
 
During the storming stage, conflicts emerge over task behaviors, relative priorities of goals, who is to be responsible for what, and the task-related guidance and direction from the leader. The key is to manage conflict during this stage, not to suppress it or withdraw from it. During the norming stage, the group sets the rules by which it will operate. Cooperation and a sense of shared responsibility develop among team members. 
 
During the performing stage, the group or team shows how effectively or efficiently it can achieve results. The roles of individual members are accepted and understood. Finally, the adjourning stage involves the termination of task behaviors and disengagement from relations-oriented behaviors. One of the major challenges for a group or team at every stage is the successful traversing of that stage, since failure can occur at any time.

Powers of the Court in case of Voluntary Winding Up

 Powers of the Court in case of Voluntary Winding Up
Powers of the Court in case of Voluntary Winding Up

1. It may appoint the Official Liquidator or any other person as liquidator where the appointed liquidator is not acting.

2. It may remove the liquidator and appoint the Official Liquidator or any other person as liquidator on justifiable cause being shown.

3. It may determine the remuneration of the liquidator when the Official Liquidator is appointed as a liquidator

4. It may amend, vary, confirm or set aside the arrangement entered into between a company and its creditors on an appeal made by any creditor or contributory within 3 weeks of the completion of the arrangement

5. On an application of the Liquidator or contributory or creditor, it may determine any question arising in the winding up of a company and it may exercise, as respects the enforcing of calls, the staying of suits or other legal proceedings or any other matter, all or any of the powers which the Court might exercise if the company were being wound up by the Court.

6. It may set aside any attachment, distress or execution started against the assets of the company after the commencement of the winding up on such terms as it thinks fit on an application made by the liquidator, creditor or contributory if the Court thinks fit.

7. It may order a public examination of any person connected with the promotion or formation of the company or any officer connected with the company.

Benefits of JIT System

Benefits of JIT System
Benefits of JIT System are the following:

1. Inventories are reduced. In addition to releasing funds tied up in financing inventories, smaller inventories reduce the risk of potential losses due to obsolescence.

2. Space is freed up. Areas that were previously devoted to storing inventories are made available for more productive uses.

3. Throughput time is reduced. This makes it easier to respond to customer demands and can be a very significant competitive advantage.

4. Defect rates are reduced. Operating without large work in process inventories makes it much easier to quickly identify and correct production problems. This latter point cannot be overemphasized. Excessive work in process inventories make it very difficult to detect and diagnose problems. 
When a facility operates without significant inventories, it is running “naked.” Problems become quickly apparent and can be dealt with in a timely manner.

What are the Key Elements of JIT?

What are the Key Elements of JIT?
A successful JIT production control systems usually have the following four key characteristics:

1. Improved plant layout. The layout of the plant must be improved to curtail distances work in process must travel. In conventional plant layouts, all of the machines of a similar class are assembled together in one location. For example, all of the milling machines are usually in one location and all of the drilling machines in another. Consequently, work in process should often move long distances between operations. There are a number of problems with this. First, moving components around the plant results in unnecessary costs. Second, moving introduces waiting time. The components sit around waiting to be moved and then it takes time to actually move them. Third, it is difficult to keep track of individual items when the inventory is scattered all over the factory floor. 

2. Reduced setup time. Reduced setup time provides the capability to respond quickly to customer orders and reduces the need for safety stocks. 

3. Low defect rates. A company should constantly strive to reduce the defects. Large numbers of defects require that excess work in process be put into production to ensure that there will be sufficient defect-free output to meet customer orders. Therefore, defects should be eliminated as much as possible in a JIT program.

4. Flexible workforce. Workers should be multi-skilled in a JIT environment, which is often organized into small “cells” that contain all of the equipment required to carry out many steps in the production process. Workers need to be able to use all of the various pieces of equipment in the work cell. Also, workers are typically expected to perform maintenance tasks on their own equipment and to do their own quality inspections.

What are FMSs and CIMs?

What are FMSs and CIMs?
Flexible Manufacturing Systems and Computer-Integrated Manufacturing

Many manufacturers have changed their basic manufacturing philosophy in the past few decades. Causes of  change  include:  (1) automated equipment and a  cellularplant layout, (2) computer hardware and software technology, and (3) new manufacturing systems and philosophies such as JIT and activity-based management.

Traditionally, most manufacturing firms employed long production runs to make thousands of identical models of the same products; this process was encouragedby the idea of economies of scale. After each run, the machines would be stoppedand a slow and expensive setup would be made for the next massive production run to begin. Now, an entirely new generation of manufacturing known as flexible manufacturing systems (FMSs) is being developed.

An FMS involves a network of robots and material conveyance devices monitored  and  controlled by  computers  that  allows  for  rapid production  and  responsiveness  to  changes  in production needs. Two or more FMSs  connected  via  a host computer and an information networking system are generally referred to as computer-integrated manufacturing (CIM). The dimensions  of  a  traditional manufacturing  system with  an  FMS. Although  an  FMS  is typically associated with short-volume production runs, many companies  have also begun to use CIM  for high-volume  lines.

What is Design for manufacturability (DFM)?

What is Design for manufacturability (DFM)?
Design for manufacturability (DFM) is a process that is part of the project management  of  a  new product. DFM  is  concerned with  finding  optimal  solutions  to minimizing product failures and other adversities in the delivery of a new product tocustomers. Objectives of DFM include optimizing customer satisfaction, cost to thecustomer of owning and using the product over its life for the customer, and cost, time, effort, and ease of producing and delivering  the product  to customers.

Cross-functional teams seeking advice from customers and assistance from suppliers  gather  and  manipulate  information  to  determine  the  material,  methods, processes and their trade-offs that will best meet their objectives. This process involves activity analysis to minimize the presence of non-value-added activities and to streamline the performance of value-added activities.

What is Backflush costing?

What is Backflush costing?
Backflush costing is  a  streamlined  cost  accounting method  that  speeds up, simplifies,  and minimizes  accounting effort  in  an environment  that minimizes  inventory balances,  requires  few  allocations, uses  standard  costs,  and has minimal variances from standard. During the period, this costing method records purchases of raw material and accumulates actual conversion costs. Then, at a predetermined trigger point such as (1) at completion of production or (2) on the sale of goods, an entry is made to allocate the total costs incurred to Cost of Goods Sold and to Finished Goods  Inventory using standard production costs.

The focus of accounting in a JIT system is on the plant’s output to the customer. Because each sequential activity in a production process is dependent on the previous activity, any problems will quickly cause the system to stop the production process. Individual daily accounting for the costs of production will no longer be necessary because all costs should be at standard, and variations will be observed and corrected almost immediately.

Additionally, fewer costs need to be allocated to products because more costs can be traced directly to their related output in a JIT system. Costs are incurred in specified cells on a per-hour or per-unit basis. Energy  is a direct production cost in a comprehensive JIT system because there should be a minimum of downtime by machines or unplanned  idle  time  for workers. Virtually  the only costs still being  allocated  are  costs  associated with  the  structure  (building  depreciation,  rent, taxes, and insurance) and machinery depreciation. The reduction of allocations provides more useful measures of  cost  control  and performance  evaluation  than have been traditionally available.

A complete JIT system

A complete JIT system
A complete JIT system begins with production, includes deliveries to a company’s production facilities, continues through the manufacturing plant and even includes the types of transactions processed by the accounting system.

(i) The company must ensure that it receives it supplies on time, preferably directly at the production facility that needs them. The company engineers must assist suppliers at their premises and ensure defect free supplies. Thus raw material inventory is reduced if correct quantities are delivered as per production schedules.
(ii) Long set-up times are reduced into short ones by eliminating inefficiency. Thus the WIP is reduced and so is the number of products before defects are identified.
(iii) A ‘Kanban’ card, which authorizes production of the right quantity by its feeder machine ensures ‘pulling’ the production process and elimination of inventory. 

Another method is the introduction of a working cell, which is a cluster of machines run by a single trained operator. This also identifies defects quickly and reduces maintenance costs. Both methods are used together.
(iv) Work force is trained to be empowered to halt operations understand more about the system, product flow, different machines and thus, elaborate reporting of a past variance is eliminated.
(v) Suppliers may be paid based on production units adjusted for defects.

How does the JIT approach help in improving an organisation’s profitability?

How does the JIT approach help in improving an organisation’s profitability?
A complete JIT system begins with production, includes deliveries to a company’s production facilities, continues through the manufacturing plant and even includes the types of transactions processed by the accounting system.
JIT approach helps in the reduction of costs/increase in prices as follows:
(i) Immediate detection of defective goods being manufactured so that early correction is ensured with least scrapping.
(ii) Eliminates/reduces WIP between machines within working cell.
(iii) OH costs in the form of rentals for inventory, insurance, maintenance costs etc. are reduced.
(iv) Higher product quality ensured by the JIT approach leads to higher premium in the selling price.
(v) Detection of problem areas due to better pdn/scrap reporting/labour tracing and inventory accuracy lead to reduction in costs by improvement.

JIT provides competitive advantage in the following ways:
(i) Stocks of raw materials and finished goods are eliminated, stock holding costs are avoided.
(ii) JIT aims at elimination of non-value added activities and elimination of cost in this direction will improve competitive advantage.
(iii) It affords flexibility to customer requirements where the company can manufacture customized products and the competitive advantage is thereby improved.
(iv) It focuses the direction of performance based production of high quality product.
(v) It minimize waiting times and transportation costs.

What is MRP-II (Material requirements planning)?

What is MRP-II (Material requirements planning)?
A material requirements planning (MRP) system is a computer based inventory information system which is used to plan and control raw material and component parts inventories.

 Pre-requisites for successful operation of MRP:

1. Strict adherence to the schedule : The successful operation of MRP system requires a strict adherence to the latest production and purchasing schedules. Workers must be educated to understand the importance of schedule adherence, and controls should be in place to ensure this adherence.
2. Accurate data base : Data accuracy is vital to the system. If a plan is based on inaccurate data it may be impossible to adhere to the schedule. For example, if the bill of materials file is not updated to reflect any changes in product composition it will be impossible to adhere to the schedule.

MRP II is the extension of MRP I

When the scope of MRP-1 is developed further which includes
1. Planning of raw material
2. planning of component & sub- assemblies
3. Compute the other resources e.g. machine or labour capacity
4. to create a full integrated plan for management

then it is known as Manufacturing resources planning ( MRP-II)

MRP II (also written MRP-2 ) adds the MRP schedule into a capacity planning system and then builds the information into a production schedule. It is also seen as a link between strategic planning and manufacturing control. The sequence of events is as follows :

A manufacturing, plan is developed based upon inputs from purchasing & production. Adjustments may be necessary to allow for production rates. Possible inventory levels in seasonal trades & the size of the workforce. The manufacturing plan leads into a detailed master production schedule which is akin to the original philosophy of MRP already outlined.

If correctly applied, MRPII provides a common data base for the different function units such as manufacturing, purchasing and finance within a firm.

What are needed to operate MRP successfully?

What are needed to operate MRP successfully?
A material requirements planning (MRP) system is a computer based inventory information system which is used to plan and control raw material and component parts inventories. Like all computer-based information system, MRP systems can be divided into following:
i) Pre-requisite information
ii) System input
iii) System processing,
iv) System output.
 

Data requirements to operate material requirement planning system:

1. The master Production schedule: This schedule specifies the quantity of each finished unit of products to be produced, and the time at which each unit will be required.
2. The Bill of material file: The bill of material file specifies the sub-assemblies, components and materials required for each finished good.
3. The inventory file: This file maintains details of items in hand for each sub-assemblies, components and materials required for each finished goods.
4. The routing file: This file specifies the sequence of operations required to manufacture components, sub-assemblies and finished goods.
5. The master parts file: This file contains information on the production time of subassemblies and components produced internally and lead times for externally acquired items.

Material Requirement Planning ( MRP-I )

Material Requirement Planning ( MRP-I )
It is a part of production operation system. Management has to develop a lot of strategies for production plan. In early 1960’s a material acquisition plan was first introduced known as Material Requirement Plan ( MRP-I ). MRP-2 is latest all-round development of that plan. 

A brief history of MRP –1

Material requirement planning is a computerized production scheduling system which takes the forward schedule of final product requirements (the master production schedule) and translates it progressively into the numbers of sub-assemblies, components and raw materials required at each stage of the manufacturing cycle.

It is a management information system providing a basis for production decisions when what is manufactured has a composite structure and when lead items are important features. Obviously, the ability of the system to deliver what is required in the correct place at the correct time will be dependent on the quality of information which is put into the computer model.

 Aims of material requirement planning:

1. Determine for final products namely, what should be produced and at what time.
2. Ascertaining the required units of production of sub-assemblies.
3. Determining the requirement for materials based on an up-to-date bill of materials file (BOM).
4. Computing inventories, WIP, batch sizes and manufacturing and packaging lead times.
5. Controlling inventory by ordering bought-in components and raw materials in relation to the orders received or forecast rather than the more usual practice of ordering from stock-level indicators.

Benefits : Detailed forecast of the inventory position is highlighted period by period.

Backflush Costing in JIT System

Backflush Costing in JIT System
Back flushing requires no data entry of any kind until a finished product is completed. At that time the total amount finished is entered into the computer system, which multiplies it by all the components listed in the bill of materials for each item produced. This yields a lengthy list of components that should have been used in the production process and which is subtracted from the beginning inventory balance to arrive at the amount of inventory that should now be left on hand. Back the entire production process. Given the large transaction volumes associated with JIT, this is an ideal solution to the problem.

However, there are some serious problems with back flushing that must be corrected before it will work properly. They are :

1. Production reporting : The total production figure entered into the system must be absolutely correct, or else the wrong component types and quantities will be subtracted from stock. This is a particular problem when there is high turnover or a low level of training to the production staff that records this information, which leads to errors.
2. Scrap reporting : All abnormal scrap must be diligently tracked and recorded; otherwise these materials will fall outside the black flushing system and will not be charged to inventory. Since scrap can occur anywhere in a production process, a lack of attention by any of the production staff can result in an inaccurate inventory. Once again, high production turnover or a low level of employee training increases this problem.
3. Lot tracing : Lot tracing is impossible under the back flushing system. It is required when a manufacturer need to keep records of which production lots were used to create a product in case all the items in a lot must be recalled. Only a picking system can adequately record this information. Some computer system allow picking and back flushing system to coexist, so that pick transactions for lot tracing purpose can still be entered in the computer. Lot tracing may then still be possible if the right software is available; however, this feature is generally present only on high-end systems.
4. Inventory accuracy : The inventory balance may be too high at all times because the back-flushing transaction that reliefs inventory usually does so only once a day, during which time other inventory is sent to the production process; this makes it difficult to maintain an accurate set of inventory records in the warehouse.

7 principles of synchronous manufacturing

7 principles of synchronous manufacturing

This concept of ‘synchronous manufacturing’ was started in 1984. It has been defined as: an all-encompassing manufacturing management philosophy that includes a consistent set of principles, procedures, and techniques where every action is evaluated in terms of the common global goal of the organisation.

A set of seven ‘principles’ are associated with synchronous manufacturing:

1. Do not focus on balance idle capacities; focus on synchronizing the production flow.
2. The marginal value of time at a bottleneck resource is equal to the throughput rate of the products processed by the bottleneck.
3. The marginal value of time at a non-bottleneck resource is negligible.
4. The level of tilization of a non-bottleneck resource is controlled by other constraints within the system.
5. Resources must be utilized, not simply activated.
6. A transfer batch may not, and many times should not, be equal to the process batch.
7. A process batch should be variable both along its route and over time.

According to synchronous manufacturing principles 2 and 3, the return on improvements at a bottleneck resource is very high. But the return on improvement made at non-bottlenecks is marginal at best. The synchronous manufacturing philosophy required managers to focus on those areas of operations where there exist potential global improvements.

Performance measurements in JIT environment

Performance measurements in JIT environment

There are several measures that are highly relevant to JIT operations. Some of them are :

1. Inventory turnover : Those who have installed JIT systems emphasize the extraordinarily high inventory turnover that they now experience, which is the case in most instances. Theturnover levels of such well-known JIT companies as Toyata have been known to exceed 70 per year, as opposed to the levels of 2 to 10 per year that are more common for companies with other types of manufacturing systems. This measure is best subdivided into smaller parts, so that one can determine the turnover levels for raw materials, work in process, and finished goods.
2. Setup time reduction : The average setup time per machine is of great importance as it can be measured periodically and plotted on a trend line. The shortest possible setup intervals are crucial for the success of short production runs, so this is a major JIT measurement. It is best to measure it by machine, rather than in the aggregate, since an aggregate measure does not reveal enough information about which equipment requires more setup time reduction work. 

3. Customer complaints : A JIT system is partly based on the premise that product quality will be superb. Consequently, any hint from customers that there are product problems should be greeted with the gravest concern and investigated immediately. The accumulation of customer complaints and their dissemination to management should be considered a major JIT measure.


4. Scrap : Little waste should be generated by a JIT system, which means that materials scrap should be driven down to exceedingly low levels. The cost of scrap (especially when supported by a detailed list of items that were scrapped) is of particular concern as a JIT system is being implemented, since it helps to identify problem areas requiring further management attention.

5. Cost of quality : One focus of JIT is on creating high-quality products, so it is reasonable to keep track of the full cost of quality (which comprises defect control costs, failure costs, and the cost of lost sales) on a trend line. Managers want to see the details behind this measure, so that they know where the largest quality costs still reside in the company and can then work to reduce them.

6. Customer service : This measure really has several components—delivering products on the dates required by customers, shipping full orders to customers, and not having products returned because of poor quality. This measure can be summarized in a variety of ways or reported at the component level, but the main issue is to measure and post the information for all to see, so that the company focuses strongly on providing the highest possible degree of customer service.

7. Ideas generated : A JIT system works best when employees pitch in with hundreds of suggestions for improvements that, when taken in total, result in a vastly improved, efficient operation. The amount of idea generation going on can be measured by the number of ideas per worker, the number of ideas suggested in total, the number of ideas implemented, or the proportion of ideas suggested that are implemented.

The common theme that unites all the JIT measures just listed is that they are not financial in nature (with the exception of the cost of quality)—they are operational measures that focus attention on the nuts-and-bolts details of creating and running a JIT system. A cost accountant involved in the calculation and reporting of these measures may feel that this is quite a departure from the more traditional cost variance measures, but the end result will be a much more efficient JIT process that churns out and delivers high-quality products.

Performance Measurements in traditional system

Performance Measurements in traditional system

Many of the performance measurement measures used under a traditional accounting system are not useful in a JIT environment, while new measures can be implemented that take advantage of the unique characteristics of this system.

(i) One of the key measurements in a traditional system is machine utilization. This is used to ensure that every asset a company purchases is being thoroughly utilized. It is particularly important in cases where there has been a large investment in automation or large, high-speed machinery, since these items are quite expensive and should be used to the utmost.

However, making machine utilization a key measurement; forces production managers in the direction of manufacturing as much product as possible in order to show a high level of machine utilization, which can result in large amount of inventory piling up in the warehouse. This is not a desirable end result in a JIT environment, where producing only what is actually needed is the underlying rule. Also, machine cells in a JIT system tend to be smaller and less costly than the highly automated (and expensive) juggernauts used in more traditional systems, so there is less need to justify the investment in these smaller machines by proving that they have been heavily used. In short, machine utilization measurements can be discarded under JIT environment.


(ii) Another inappropriate measurement is any type of piece rate tracking for each employee. This is a common measure in the textile industry, where employees are paid extra if they exceed certain production volume targets. However, a JIT system focuses on producing only what is needed, so an employee who has incentives to create vast piles of parts is producing contrary to the rules of the system. Accordingly, any piece rate system must be eliminated and replaced with measures that focus instead on the quality of output or the number of employee suggestions for improving the system, which are much more important outcomes in a JIT system.

(iii) Any type of direct labour efficiency tracking is highly inappropriate in a JIT system. It is a key measurement in more traditional systems, where employee time and productivity are closely monitored and measured. However, a JIT system does not focus on how fast an employee works—only on the quality of the products manufactured. Also, labour variance measurements require considerable employee time tracking, which forces workers to fill in a time sheet, punch a clock, or use a bar coding system to track what they are doing and what job they are working on. All this labour tracking is a non-value-added activity, which is something a JIT system strives to avoid as an unnecessary activity. Consequently, the cost accounting staff should advocate the complete elimination of all labour variance measurements.

(iv) Installing a JIT system does not mean that there should be a complete elimination of variance or operational measures. There are still several measures that are highly relevant to operations. 

How Cost Allocation is different in JIT System?

How Cost Allocation is different in JIT System?
The chief difference between the types of cost allocations under jit and traditional environment is that of converting most of the overhead costs to direct costs. The primary reason for this change is the machine cell. Because a machine cell is designed to produce either a single product or a single component that goes into a similar product line. Therefore all the costs generated by the machine cell can be charged directly to the only product it produces. When a company completely change over to the use of machine cells in all locations, the costs related to all the cells can now be charged directly to products, which leaves few costs of any kind to be allocated through a more traditional overhead cost pool. the result of this change results in more accurate product costs. Specifically, the costs that can now be charged directly to product are:

• Depreciation. The depreciation cost of each machine in a machine cell can be charged directly to a product. It may be possible to depreciate a machine based on its actual use, rather than charging off a specific amount per month, since this allocation variation shifts costs to a product more accurately.

• Electricity. The power used by the machine in a cell can be separately metered and then charged directly to the products that pass through the cell. Any excess electricity cost charged to the facility as a whole still has to be charged to an overhead cost pool for allocation.

• Material handling. Most materials handling costs in a JIT system are eliminated since machine operators move parts around within their machine cells. Only costs for materials handling between cells should be charged to an overhead cost pool for allocation.

• Operating supplies. Supplies are used mostly within the machine cells, so the majority of items in this expense category can be separately tracked by individual cell and charged to products.

• Repairs and maintenance. Nearly all the maintenance costs a company incurs are for machinery and they are all grouped into machine cells. By having the maintenance staff, charge their time and materials to these cells, these costs can be charged straight to products. Only maintenance work on the facility is still charged to an overhead cost pool.

• Supervision. If supervision is by machine cell, the cost of the supervisor can be split among the cells supervised. However, the cost of general facility management as well as of any support staff, must still be charged to an overhead cost pool.

JIT impact on product prices:

JIT impact on product prices:

When a company achieves a higher level of product quality, along with ability to deliver products on the dates required, customers may be willing to pay a premium. This is particularly true in industries where quality or delivery reliability is low. If customers are highly sensitive to these two factors, it may be possible to increase prices substantially. Alternatively, if these factors are not of great importance, or if customers place a higher degree of importance on other factors, then there will be no opportunity for a price increase.

In industries where many companies are adopting JIT systems at the same time or have already installed them, an improvement in product quality and delivery times does not differentiate a company from its peers. Instead, since everyone else is offering the same level of quality and service, it just keeps a company from losing sales to its competitors. In such a situation it is more likely that all companies remaining in the industry will use their new-found lower costs to initiate a price war that will result in a drop in prices.

Consequently, the impact of a JIT system on product pricing is primarily driven by customers’ perceived need for higher product quality and reliable delivery times, as well as the presence of competitors with JIT system, the same installation, and operational base. 

Impact of JIT on overheads

Impact of JIT on overheads

The costs of material handling, facilities, and quality inspection decline when a jit system is installed. In addition, the reduction of all types of inventory results in a massive reduction in the amount of space required for the warehouse facility. Since all costs associated with the warehouse are assigned to the overhead cost pool, the amount of overhead is reduced when the costs of staff, equipment, fixed assets, facilities, and rent associated with the warehouse are sharply cut back.

There is also a shift of costs from the overhead cost pool to direct costs when machine cells are introduced. The reason for this change is that a machine cell generally produces only a small range of products, making it easy to assign the entire cost of each machine cell to these items. This means that the depreciation, maintenance, labour and utility costs of each cell can be charged straight to a product, which is preferable to the traditional approach of sending these costs to an overhead cost pool from which they are assigned to products in much less identified manner. Though this change does not represent a cost increase or reduction, it does increase the reliability of allocation for many more costs than that was previously the case.

Despite the shift of many overhead costs to direct costs, there is still an overhead cost pool left over that must be allocated to products. However, given the large number of changes implemented as part of the JIT system, cost accountants may find that there are now better allocation bases available than the traditional direct labour allocation. For example, the amount of time a product takes in each work cell may be a better measure for allocating costs, instead of amount of space occupied in the work cells that create each product. No matter what allocation system is used, it is some what different from the old system, so there is a shift
in the allocation of costs between different products.

In short, overhead costs decline as some costs are eliminated, while other costs shift between products as more costs are charged directly to products and the remaining overhead costs are charged out using different allocation methods.